每个学生都受到影响
-
The 谢尔曼ISD 2023 债券 includes projects that will impact every single student in the district, 从幼儿到12年级. On the ballot, it consisted of two propositions totaling $540,金沙博彩,金沙博彩.
The timeline for the projects is subject to change based on unforeseen circumstances such as weather, 工程建设延期, 和/或供应链问题.
提案A, 493,185,金沙博彩美元
- District-wide Safety, Security, and Technology (begins immediately)
- 新K-5小学(2025年秋季开学)
- 新小学K-5(待定)
- Replacement of 克拉奇菲尔德小学 (opens Fall 2025)
- Replacement of 锦绣小学 (opens Fall 2025)
- Additions to 谢尔曼高中 (complete Fall 2025)
- 新幼儿中心(2026年秋季开放)
- Conversion of 迪林厄姆小学 to a Middle School (complete Fall 2029)
- 装修 to 杰斐逊学习中心 (complete TBD)
- Additions and 装修 to 派纳中学 (complete Fall 2030)
提案B: 46,815,金沙博彩美元
- Completion of New Multipurpose Stadium at 谢尔曼高中 (opening TBD)
项目
-
新建和替代小学
- The construction of two new elementary schools will alleviate functional capacity concerns at the district’s current elementary schools. The enrollment capacity for each school will be 712 students, serving students in grades K-5.
- Crutchfield (1951) and Fairview (1952-53) elementary schools were all built in the 1950s and do not meet current educational and building requirements. Replacement campuses at these sites will improve functional capacity and increase maximum capacity at each to 712 students. Additions completed in 1996 will be retained and incorporated into the new schools. The existing campuses will continue to serve students without disruption while construction is underway on the opposite side of the properties.
- Elementary student capacity will increase from the current 809 to 2,848 -产生额外的2,039 student capacity across the district’s elementary schools.
- The new state-of-the-art facilities will include the latest in technology and safety and security for students and staff.
- Each new school will include a storm shelter built to withstand winds of up to 250 miles per hour.
-
谢尔曼高中的新成员
- Additions will allow 谢尔曼高中 to meet growing enrollment challenges by increasing student capacity from the current 2,688 to 3,213人(增加525人).
- The new additions will include 33,428 square feet of new 教室 and additions to SHS.
- 新增内容包括新的摄像系统, 击剑, safety and impact-resistant glass at accessible doors, and Emergency First Responders Communication Infrastructure.
-
NEW EARLY CHILDHOOD CENTER (at current site of Wakefield Elementary)
- Combined capacity of both the current Fred Douglass (originally built in 1943) and 佩兰幼儿中心s (originally built in 1959) is 534. This new ECC will have a capacity of 594 students. This facility will be constructed on the site of the current Wakefield Elementary.
- A single campus will accommodate more students, 合并和加强现有的项目, 提高运营效率, and provide the opportunity for the district to offer tuition-based pre-kindergarten to students whose families don’t qualify for the free program based on state criteria.
- The new facility will include a storm shelter built to withstand winds of up to 250 miles per hour.
-
CONVERT DILLINGHAM ELEMENTARY TO A MIDDLE SCHOOL
- Project will include additions and renovations to the existing building, 哪座最初建于1997年.
- The project will increase building capacity by 254 students, 从目前的建筑容量890个增加到1个,144名学生.
- Additions include the construction of a storm shelter, as well as upgrades to both athletic and fine arts areas.
- 装修 will be done in the library, 教室, corridors, and 合作的空间.
-
杰斐逊学习中心翻新
- The renovations will provide updates and renovations to the district’s special programs facility, 哪个最初建于1931年.
- The renovations will include roof replacement as well as repairs and upgrades to mechanical, 电, 管道系统.
-
松树中学翻修
-
Project will include additions and renovations to the existing building, 哪个最初建于1953年.
-
Enrollment capacity will increase from the current 853 students to 1,114名学生, 增加291名学生.
-
新增加的部分包括一个避风处, built to withstand winds of up to 250 miles per hour, 运动和美术领域.
-
翻新工程将包括图书馆, 科学实验室, 教室, 管理领域, 合作的空间, 安全和安保升级.
-
-
COMPLETE MULTIPURPOSE STADIUM AT SHERMAN HIGH SCHOOL
- Completion of a new multipurpose stadium at 谢尔曼高中 utilizing the existing athletic field, track, 和基础设施
- The stadium will serve football, soccer, track, and other extra- and co-curricular activities
- 项目将增加座位, 卫生间, 让步, 和一个最多可容纳8人的新闻箱,金沙博彩名观众
- The new stadium will also improve safety and security, 提供充足的停车位, reduce the need for busing and students driving to Bearcat Stadium, and provide handicap and wheelchair accessibility
- 谢尔曼高中 is poised to be assigned to 6A, the state’s largest athletic classification in the near future
- The historic and beloved Bearcat Stadium will continue to be used for middle school and youth sports as the district expands to three middle schools